How MegaKC is Building Smarter Wastewater Infrastructure at Todd Creek

Todd Creek Site, September 2026

MegaKC is constructing a new wastewater treatment plant for KC Water in Kansas City’s Northland. Since its construction in the late 1960’s and later expansion in 1990, the existing Todd Creek Wastewater Treatment Plant has reached it capacity as the population and development in the northland has grown. The new facility is being built on a greenfield site rather than modifying the existing plant, creating an opportunity to incorporate advanced technology and plan for future community needs.

 

Why Kansas City needs a new Todd Creek facility

Since its last expansion in 1990, the population of the greater Northland has more than doubled. This population growth combined with Kansas City International Airport’s recent upgrade, has created a demand greater than the capacity of the current plant. The new Todd Creek Plant will have an average daily flow of 4.6 million gallons, an increase from 2.2 MGD at the existing plant.

 

What makes Todd Creek different: Aerobic Granular Sludge technology

Rather than relying exclusively on traditional treatment methods, the new facility will use a process called Aerobic Granular Sludge Technology (AGS) to help remove contaminants from wastewater. Using aerobic granular biomass, microorganisms form dense granules that settle more quickly, helping separate treated water from solids. This process requires less space, takes less time, and is up to 50% more energy efficient than conventional methods.

 

The Todd Creek Wastewater Treatment Plant will be the first greenfield project in the state of Missouri to use this technology. Unlike renovations or expansions of operating treatment plants, MegaKC is building an entirely new facility on a site with minimal existing infrastructure. “We’re not going in and doing open-heart surgery on an existing plant. This is a new facility built in a place that has no infrastructure outside of the force main,” said Mike Newman, a MegaKC superintendent on the project.

 

Building from the ground up provides an opportunity to integrate advanced treatment systems into a new facility while allowing space for future expansion. The plant’s design includes provisions for additional AGS treatment basins as the Northland continues to grow.

 

Looking Ahead

The new Todd Creek Wastewater Treatment Plant represents more than an investment in modern treatment technology. It is an investment in the infrastructure that supports Kansas City’s continued growth.

 

Through its work at Todd Creek, MegaKC is helping KC Water build a facility designed to meet today’s wastewater treatment needs while preparing for the demands of tomorrow.