Market
Civil
Client
City of Platte City
Timeline
2021
Delivery Method
Design-Build
Pass-through water system installation including piping and valves for a future aquatics center connection. Scope included a 2,400-square-foot concrete spray pad with an additional 600–700 square feet of concrete border, featuring approximately 17–24 spray elements with 40 percent above-ground structures. The design provides age-balanced play zones with sequenced, timed spray controls and one or more activation bollards.