Market
Water
Client
City of Lawrence
Timeline
Start: January 2025
Ongoing
Delivery Method
Design Bid Build
The project includes demolition and disposal of the existing liquid lime storage tank and chemical feed structure. New improvements feature the installation of two 7,000-gallon sodium hydroxide storage tanks on the existing concrete pad, along with a day tank, transfer pump, and a chemical metering pump skid housed within the existing chemical feed building.
VIEW MORE
>