Market
Civil
Client
Kansas City Parks and Recreation
Timeline
Summer 2021
Delivery Method
Design-Build
Using the Design-Build method, MegaKC extended an existing walking trail through a Kansas City, Missouri Parks and Recreation greenway that had difficult access due to the extensive changes in elevations throughout the greenway. The project was constructed using built-in-place, stick-framed wooden boardwalks, framing and a concrete trail connecting the boardwalks. ADA compliance was critical in design and construction, as well as greenway conservation and preservation of the native landscape.
VIEW MORE
>