Project Description

Blacksnake Creek Stormwater Separation Improvements

St. Joseph, Mo.

  • Construction of a 7’x6′ below-grade pre-cast box culvert at 5,738 feet in length, including four junction structures and an inlet structure to the existing Blacksnake Creek sewer system; rehab of the existing screening structure and sliding gate.