Water Treatment

Below are a few of our water treatment station projects.

Blue River No.14 Pump Station and Force Main, Overland Park, KS
Rock Creek Aeration Improvements, Independence, MO
Waukomis Pumping Station Rehabilitation, Kansas City, MO
Parkville Waste Water Treatment Facility
Southwest Blvd Pump Station, Kansas City, MO
Peak Flow Lift Station, Grain Valley, MO
Todd Creek WWTP, Kansas City, MO


Blue River No.14 Pump Station and Force Main, Overland Park, KS

Work under this contract consisted of construction of a pump station, control building, parking areas, and approximately 2740 feet of 6 inch DIP force main with bore and casing, trenching, installation, backfill, restoration, and other appurtenances

Contract Price: $2,022,382.50

8.1 Before start of construction 8.4 Tying rebar at wetwell structure 8.6 Setting manholes 8.9 Fencing in place 8.10 Completed construction
<
>

back to top

 

Rock Creek Aeration Improvements, Independence, MO

Upgrade of existing Aeration System; including removal of four (4) mechanical aerators, the installation of a diffused air (fine bubbler) aeration system, 5 high speed turbine blowers, and associated process piping, a CMU blower building, and associated electrical improvements.

Contract Price: $1,596,374

Rock Creek Aeration Improvements - Water Treatment Rock Creek Aeration Improvements - Water Treatment Rock Creek Aeration Improvements - Water Treatment Rock Creek Aeration Improvements - Water Treatment Rock Creek Aeration Improvements - Water Treatment Rock Creek Aeration Improvements - Water Treatment Rock Creek Aeration Improvements - Water Treatment Rock Creek Aeration Improvements - Water Treatment
<
>

back to top

 

Waukomis Pumping Station Rehabilitation, Kansas City, MO

Clean water pump station rehabilitation including removal and replacement of four horizontal split case centrifugal 300 HP pumps (two direct drive and two variable speed drive) along with all associated mechanical piping, valves and yard piping, electrical room addition with all new electrical equipment, controls and instrumentation, masonry restoration, roof replacement, concrete foundations, structural steel framing and aluminum grating, chain hoist, site improvements including grading, asphalt roadway and pervious concrete pavement. All work was phased to allow the existing pump station to remain on line for continuous operation to serve the City’s water demand needs.

Contract Price: $2,641,766

Waukomis Pumping Station Rehabilitation - Water Treatment Waukomis Pumping Station Rehabilitation - Water Treatment Waukomis Pumping Station Rehabilitation - Water Treatment Waukomis Pumping Station Rehabilitation - Water Treatment Waukomis Pumping Station Rehabilitation - Water Treatment Waukomis Pumping Station Rehabilitation - Water Treatment Waukomis Pumping Station Rehabilitation - Water Treatment Waukomis Pumping Station Rehabilitation - Water Treatment
<
>

back to top

 

Parkville Waste Water Treatment Facility

The purpose of the expansion was to add disinfection capabilities of plant effluent using ultraviolet light. The project consisted of many items including reinforcing the concrete structure with concrete water channels, creating a wood overhead structure system and an ultra-violet light disinfection system.

Parkville Waste Water Treatment Facility - Water Treatment Parkville Waste Water Treatment Facility - Water Treatment Parkville Waste Water Treatment Facility - Water Treatment Parkville Waste Water Treatment Facility - Water Treatment Parkville Waste Water Treatment Facility - Water Treatment Parkville Waste Water Treatment Facility - Water Treatment Parkville Waste Water Treatment Facility - Water Treatment Parkville Waste Water Treatment Facility - Water Treatment Parkville Waste Water Treatment Facility - Water Treatment Parkville Waste Water Treatment Facility - Water Treatment
<
>

back to top

 

Southwest Blvd Pump Station, Kansas City, MO

Demolition of existing station, and construction of a new pump station. Removal, rehabilitation and replacement of two 30,000 GMP pumps, variable frequency drives, controls and flow meters.

Contract Price: $1,787,000

Southwest Blvd Pump Station - Water Treatment
<
>

back to top

 

Peak Flow Lift Station, Grain Valley, MO

Construction of Phase 3 Peak Flow Lift Station included all piping, equipment installation, power supplies, controls and appurtenances as required for a complete installation and functioning system.

Contract Price: $4,081,291

Peak Flow Lift Station - Water Treatment Peak Flow Lift Station - Water Treatment Peak Flow Lift Station - Water Treatment Peak Flow Lift Station - Water Treatment Peak Flow Lift Station - Water Treatment Peak Flow Lift Station - Water Treatment Peak Flow Lift Station - Water Treatment Peak Flow Lift Station - Water Treatment
<
>

back to top

 

Todd Creek WWTP, Kansas City, MO

Construction modifications to existing headworks, influent pump station, basins and operations building. New flow distribution box and effluent flume structure and SCADA system.

Contract Price: $2,994,000

Todd Creek - Water Treatment Todd Creek - Water Treatment Todd Creek - Water Treatment Todd Creek - Water Treatment
<
>